Skip to content
White farmhouse with a newly replaced black metal porch roof beside a brick chimney

Residential Roof Replacement

Roof Replacement Built for the Long Run

Full tear-offs and re-roofs for houses that have run out of road — with an honest read on whether yours has.

When It Is Time

Stop Putting Money Into an Aging Roof

There is a point where repairs stop being repairs and start being instalments on a replacement you have not agreed to yet.

The signs are familiar enough: granules in the gutter, shingles curling at the edges, a stain on a bedroom ceiling that comes back every spring, and a patch bill every couple of years that nobody adds up.

What makes it urgent is what you cannot see. Once water is getting past the shingle it is working on the decking, and decking damage is the difference between a re-roof and a re-roof plus carpentry.

We will tell you plainly which side of that line you are on. If the roof has five good years left, replacing it now is money you did not need to spend yet.

Roofer carrying a ladder past a ranch house with a newly re-roofed rear addition

How We Work

What a Tear-Off Day Actually Looks Like

We tarp the beds and the walls before anything comes off, and we dumpster on site rather than piling debris in the yard.

Old material comes off down to the deck. Every sheet gets looked at, and anything soft gets replaced — we show you what we found and what we did about it rather than quietly covering it.

Then underlayment, then ice and water shield in the valleys and at the eaves, then the roof itself, then the trim and the flashing by hand.

Before we leave we run a magnet over the drive and the lawn for nails. Most houses are two to four days start to finish.

Scaffolding against a house with a new black standing seam roof and white siding

What We Install

Designed for Protection, Built to Last

Every roof replacement is different. We quote the options against your house, your budget and how long you intend to be in it — not against a package.

  • Metal Roof Replacement

    The long answer: fifty years, one install, and no second tear-off inside your ownership of the house.

    Get estimate →
  • Standing Seam Upgrade

    Hidden-fastener panel for homeowners who are staying put and want the last roof they will buy.

    Get estimate →
  • Shingle Roof Replacement

    Architectural shingle where metal is not the right call — a near-term sale, or a budget that has to work this year.

    Get estimate →

Why Homeowners Choose Power Roofing

Roofing Systems Built for Ohio Weather

  1. 01

    Lifetime Workmanship

    Our installation is warranted for as long as you own the house, in writing, before you sign anything.

  2. 02

    40-Year Paint Warranty

    Sherwin-Williams finishes engineered against fading and chalking for four decades on every metal system we install.

  3. 03

    Direct-to-Installer Pricing

    No middlemen, no commissioned salesman, no high-pressure close. The people who quote it are the people who install it.

Recent Work

Jobs Like Yours

See the full gallery →
  • Aerial view of a dark grey standing seam metal roof with three dormers and a wraparound porch

    Standing seam over a wraparound porch, three dormers flashed by hand.

  • Two Amish roofers on ladders fitting trim to the gable of a black metal-roofed outbuilding

    Trim work on a black metal outbuilding — the edges are the job.

  • Black barndominium with a standing seam metal roof, timber gable truss and full-width porch

    Post-frame home in black, with an exposed timber gable over the entry.

  • Gable end of a black metal roof and matching board and batten siding with a stove pipe

    Gable end, matching roof and wall panel, stove pipe flashed in.

  • White clapboard farmhouse with a new black metal porch roof beside a brick chimney

    Porch roof replaced in metal — the low-slope section that kept leaking.

  • New black metal roof and soffit on a two-storey brick commercial building

    Commercial re-roof on a brick storefront, soffit and fascia to match.

Common Questions

Roof Replacement Built for the Long Run FAQs

How do I know whether I need a replacement or a repair?

If the failure is localised — a flashing, a pipe boot, storm damage in one area — it is a repair. If the shingle is curling and shedding granules across the whole roof, it has reached the end of its life and repairs are just instalments. We will tell you which you have.

How long does a roof replacement take?

Two to four days for most houses. Steep pitches, several dormers and complicated valleys add time, because the hand-formed trim work is what takes the hours.

Will you replace rotten decking?

Yes, and we show you. Deck condition is not fully knowable until the old roof is off, so we quote a per-sheet rate up front and you only pay for what was actually bad.

Do you work with insurance after storm damage?

We document everything with photographs and give you a written scope for your adjuster. We do not file the claim for you and we will not promise an outcome before your insurer has seen the roof.

Should I replace my gutters at the same time?

Usually yes. The gutter has to be hung to suit the new roof edge, and doing both as one job avoids paying twice for the same setup.

Ready to Get a Number You Can Trust?

Free estimate, measured on site, written down, and honest about whether you need the work this year.

Serving Southeast & Central Ohio

Ready to Upgrade Your Exterior System?

Call or text
(740) 288-5191
Service area
Zanesville • Athens • Lancaster • Logan • Chillicothe • Newark • Jackson • Perry County • Morgan County • Meigs County • Vinton County

We answer during working hours, usually the same day. Prefer to talk now? Call or text (740) 288-5191.